A diversified portfolio of projects, underpinning high-quality growth to 2021 and beyond
Upstream major projects

大量偷拍情侣自拍视频By 2021, we expect to add 900 mboed of new production net to BP from our major projects compared with our 2015 base portfolio, the majority of which have passed through the final investment decision and are complete or well under construction. You can find more information on our projects in the construction and design stages in the map below.

In addition to the map above we provide details of our construction and design phase projects below.? Also provided are links to pages detailing projects in operation or scheduled for start-up in 2019 and beyond.?

Projects in construction

Alligin

Alligin is located 87 miles west of Shetland in a water depth of approximately 1,600 feet. The Alligin development will consist of two wells, which will be tied-back into the existing Schiehallion and Loyal subsea infrastructure, utilizing the processing and export facilities of the Glenn Lyon FPSO.

Location
North Sea
Operator BP
Partners BP (50%), Shell (50%)
Project type Conventional oil
Start-up 2020
Peak annual average production, gross ~ 10 mboed 
Peak annual average production, net ~ 5 mboed 

Atlantis Phase 3?

Atlantis Phase 3 will include the construction of a?new subsea production system?from eight new wells that will be tied into the?current Atlantis platform,?150 miles south of New Orleans in water depth of over 7,000 feet.?

Location
US – Gulf of Mexico
Operator BP
Partners BP (56%), BHP Billiton
(44%)
Project type Deepwater oil
Start-up 2020
Peak annual average production, gross ~40 mboed 
Peak annual average production, net ~20 mboed 

Azeri Central East (ACE)

The ACE project is a development which includes a new 48-slot production, drilling and quarters platform located?mid-way between the existing Central Azeri and East Azeri platforms in?approximately 460 feet of water depth. New infield pipelines will transfer oil?and gas from the ACE platform to the existing ACG Phase 2 oil and gas export?pipelines for transportation to the onshore Sangachal terminal.

Location
Azerbaijan
Operator BP
Partners BP (30.37%), SOCAR (25.00%), Chevron (9.57%), INPEX (9.31%), Equinor (7.27%), ExxonMobil (6.79%), TP (5.73%), ITOCHU (3.65%), OVL (2.31%) 
Project type Conventional oil
Start-up 2023
Peak annual average production, gross ~ 80 mboed 
Peak annual average production, net ~ 10 mboed 

Cassia Compression

The project will involve construction of a new platform with throughput capacity of 1.2 billion standard cubic feet of gas a day. Cassia C will be located ~35 miles off the south-east coast of Trinidad. Gas production from the Greater Cassia Area will be routed to Cassia C for compression before being exported via the adjacent existing Cassia B platform.??

Location
Trinidad
Operator BP
Partners 100% owned by BP Trinidad and Tobago which is owned by BP (70%) and Repsol (30%)
Project type LNG
Start-up 2021
Peak annual average production, gross ~55 mboed 
Peak annual average production, net ~55 mboed 

KG D6 MJ

The MJ project is the third phase of Block KG D6 development?off the east coast of India. Together three projects are expected to develop a?total of about 3 trillion cubic feet of discovered gas resources. MJ field is?located approximately 20 miles offshore and in 2,300-3,600 feet water depth.?Seven subsea wells will tie-back to a new Floating Production Storage and?Offloading (FPSO) vessel to process? and separate liquids. Gas will be exported?to the onshore terminal through an existing 24-inch pipeline.?

Location
India
Operator Reliance
Partners Reliance (60%), BP (30%), Niko (10%)
Project type Conventional gas
Start-up 2022
Peak annual average production, gross ~90 mboed
Peak annual average production, net ~25 mboed

KG D6 R Series

The R-Series project is the first of three projects in Block KG D6 off the east coast of India. The gas field is located approximately 45 miles offshore in water-depths of more than 6,500 feet. The R-Series project will be developed as a six well subsea tie back to the existing control and riser platform off Block KG D6.

Location
India
Operator Reliance
Partners Reliance (60%), BP (30%), Niko (10%)
Project type Dry gas
Start-up 2020
Peak annual average production, gross ~90 mboed 
Peak annual average production, net ~25 mboed 

KG D6 Satellites

The Satellites project is the second of three projects in Block KG D6 off the east coast of India. It is a dry gas development and comprises four discoveries in 4,300 - 6,200 feet water depth. It will be developed as a five well subsea tie back to the existing control and riser platform off Block KG D6. KG D6 integrated development is aimed at delivering one billion standard cubic feet gross production a day by 2022 and supports country agenda by increasing domestic gas supply.

Location
India
Operator Reliance
Partners Reliance (60%), BP (30%), Niko (10%)
Project type Dry gas
Start-up 2021
Peak annual average production, gross ~45 mboed 
Peak annual average production, net ~15 mboed 

Khazzan Phase 2 (Ghazeer)

大量偷拍情侣自拍视频The second phase of the onshore Khazzan field development involves drilling approximately 100 wells, construction of a third train, a new export pipeline and tie-in to the existing Phase 1 facilities. The second phase (Ghazeer) is expected to deliver an additional 0.5bcf/d and over 15,000 barrels a day of condensate, bringing total Khazzan gas production to ~ 1.5bcf/d.?

Location
Oman
Operator BP
Partners BP (60%), Oman Oil (30%), Petronas (10%)
Project type Tight gas
Start-up 2021
Peak annual average production, gross ~115 mboed 
Peak annual average production, net ~70 mboed 

Mad Dog Phase 2

The Mad Dog Phase 2 project includes a new semi-submersible floating production platform with the capacity to produce up to 140,000 gross barrels of crude oil per day from 14 production wells and inject up to 140,000 barrels of water per day using a LoSal system to enhance oil recovery. The new platform will be moored approximately six miles southwest of the existing Mad Dog platform, which is located in 4,500 feet of water about 190 miles south of New Orleans.

Location
US - Gulf of Mexico
Operator BP
Partners BP (60.5%), BHP Billiton (23.9%), Chevron (15.6%)
Project type Deepwater oil
Start-up 2021
Peak annual average production, gross ~120 mboed 
Peak annual average production, net ~65 mboed 

Manuel

Manuel is an infrastructure-led (ILX) opportunity at Na Kika area. The development is a two well tie-back to Na Kika via a single riser and flowline.?

Location
US - Gulf of Mexico
Operator BP
Partners BP (50%), Shell (50%)
Project type Deepwater oil
Start-up 2020
Peak annual average production, gross ~15 mboed 
Peak annual average production, net ~5 mboed 

Matapal

The Matapal?project will develop the gas resources discovered by BPTT in 2017 with the?Savannah exploration well. The project will be a three-well subsea tie-back to?the existing Juniper platform. The project production capacity will be 400?million standard cubic feet of gas a day.

Location
Trinidad
Operator BP
Partners 100 % owned by BP Trinidad and Tobago which is owned by BP (70%) and Repsol (30%)
Project type LNG
Start-up 2022
Peak annual average production, gross ~70 mboed 
Peak annual average production, net ~70 mboed 

Seagull

大量偷拍情侣自拍视频Seagull?is a high pressure, high temperature development located in the Central North?Sea approximately 10 miles south of the ETAP Central Processing Facility (CPF).?Seagull will be tied back to the ETAP CPF partially utilising existing subsea?infrastructure. Gas from the development will come onshore at the CATS?processing terminal at Teesside, while oil will come onshore through the?Forties Pipeline System to the Kinneil Terminal, Grangemouth.

Location
North Sea
Operator Neptune Energy
Partners BP (50%), Neptune Energy (35%), JAPEX (15%)
Project type Conventional oil
Start up 2022
Peak annual average production, gross ~30 mboed 
Peak annual average production, net ~15 mboed 

Tangguh Expansion

The Tangguh Expansion project, located in the Papua Barat Province of Indonesia, will add a third LNG process train (Train 3) and 3.8 million tons per annum (mtpa) of production capacity to the existing facility, bringing total plant capacity to 11.4 mtpa. The project also includes two offshore platforms, 13 new production wells, an expanded LNG loading facility, and supporting infrastructure.

Location
Indonesia
Operator BP
Partners BP (40.22%) MI Berau B.V. (16.30%), CNOOC Muturi Ltd (13.90%), Nippon Oil Exploration (Berau) Ltd (12.23%), KG Berau Petroleum Ltd (8.60%), KG Wiriagar Overseas Ltd (1.40%), Indonesia Natural Gas Resources Muturi Inc. (7.35%)
Project type LNG
Start-up 2021
Peak annual average production, gross ~115 mboed 
Peak annual average production, net ~40 mboed 

Thunder Horse South Expansion Phase 2

大量偷拍情侣自拍视频Thunder Horse South Expansion Phase 2 will further boost output of the existing Thunder?Horse field, one of the largest oil fields in the Gulf of Mexico. This project?will add two new subsea production units roughly two miles to the south of the?existing Thunder Horse platform with two new production wells in the near term.?Eventually eight wells will be drilled as part of the overall development.

Location
US - Gulf of Mexico
Operator BP
Partners BP (75%), ExxonMobil (25%)
Project type Deepwater oil 
Start-up 2021
Peak annual average production, gross ~50 mboed 
Peak annual average production, net ~30 mboed 

Tortue Phase 1

大量偷拍情侣自拍视频Tortue Phase 1 is the first phase of the Greater Tortue Ahmeyim project?which will produce gas from an ultra-deepwater subsea system and mid-water?floating production, storage and offloading (FPSO) vessel. The gas will be?transferred to a floating liquefied natural gas (FLNG) facility at an?innovative nearshore hub located on the Mauritania and Senegal maritime border.?The FLNG facility is designed to provide circa 2.5 million tonnes of LNG per?annum of nameplate capacity, with the total gas resources in the field estimated to be?around 15 trillion cubic feet.

Location
Mauritania and Senegal
Operator BP
Partners BP (56%), Kosmos (27%), PETROSEN (10%*), SMHPM (7%) 
Project type LNG
Start-up 2022
Peak annual average production, gross ~70 mboed 
Peak annual average production, net ~35 mboed 
*Subject to nomination process completion

Vorlich

Vorlich, a two-well development approximately 150 miles east of Aberdeen, will be tied back to the Ithaca Energy-operated FPF-1 floating production facility, which lies at the centre of Greater Stella Area production hub.

Location
North Sea
Operator BP
Partners BP (66%), Ithaca (34%)
Project type Conventional oil
Start-up 2020
Peak annual average production, gross ~20 mboed 
Peak annual average production, net ~15 mboed 

Zinia Phase 2

Zinia 2 is the first of several possible short-cycle developments on Block 17 that will unlock its full?potential by connecting satellite reservoirs to the existing floating storage,?production and offloading (FPSO) units. Zinia 2 comprises nine wells in water?depths ranging from 2,000 to 4,000 feet, tied back to the Pazflor FPSO.

Location Angola
Operator Total
Partners BP (16.67%), Total (40%), Equinor (23.33%), ExxonMobil (20%)
Project type Deepwater oil
Start-up 2021
Peak annual average production, gross ~35 mboed 
Peak annual average production, net ~5 mboed 

Projects in design

Browse

Location
Australia
Operator Woodside
Partners Woodside (30.60%), Shell (27.00%), BP (17.33%), Japan Australia LNG (14.40%) and PetroChina (10.67%)
Project type LNG
Start-up Beyond 2021
Project stage Design

Clair South West

Location
UK - North Sea
Operator BP
Partners BP (45.1%), Shell (28%), Conoco Phillips (7.5%), Chevron (19.4%)
Project type Conventional oil
Start-up Beyond 2021
Project stage Design

Cypre

Location
Trinidad
Operator BP
Partners 100% owned by BP Trinidad and Tobago which is owned by BP (70%) and Repsol (30%)
Project type LNG 
Start-up Beyond 2021
Project stage Design

Mad Dog North West Injection

Location
US - Gulf of Mexico
Operator BP
Partners BP (60.5%), BHP Billiton (23.9%), Chevron (15.6%)
Project type Deepwater oil 
Start-up Beyond 2021
Project stage Design

Platina

Location
Angola
Operator BP
Partners BP (46%), Sonangol Sinopec International Limited (SSI) (54%)
Project type Deepwater oil 
Start-up 2021
Project stage Design

Skua

Location
North Sea
Operator BP
Partners BP (80%), Zennor (20%) 
Project type Conventional oil
Start-up Beyond 2021
Project stage Design

Tortue Phase 2/3

Location
Mauritania and Senegal
Operator BP
Partners BP (56%), Kosmos (27%), PETROSEN (10%*), SMHPM (7%)
Project type LNG
Start-up Beyond 2021
Project stage Design
*Subject to nomination process completion
日日摸天天摸人人看,日日摸天天摸人人看大量偷拍情侣自拍视频,日日摸天天摸人人看手机播放 大量偷拍情侣自拍视频区偷拍大量偷拍情侣自拍视频,7 tav大量偷拍情侣自拍视频大量偷拍情侣自拍视频,国产偷拍99线观看 97碰碰人人插视频 大量偷拍情侣自拍视频区偷拍大量偷拍情侣自拍视频 五月婷婷_大量偷拍情侣自拍视频在线_十月丁香_大量偷拍情侣自拍视频网站 大量偷拍情侣自拍视频_久久99re6热在线播放_大量偷拍情侣自拍视频大量偷拍情侣自拍视频_大量偷拍情侣自拍视频大量偷拍情侣自拍视频 大量偷拍情侣自拍视频_水中大量偷拍情侣自拍视频_水中大量偷拍情侣自拍视频网_大量偷拍情侣自拍视频av大量偷拍情侣自拍视频 91大量偷拍情侣自拍视频-91视频网-91视频怎么看-这里只有大量偷拍情侣自拍视频-91大量偷拍情侣自拍视频 大量偷拍情侣自拍视频-1024手机看片基地永久免费